Replacement · Northern Europe
Replacing two gas lines at a municipal crematorium
The challenge
Two ageing gas cremators, rising maintenance costs and tighter mercury limits, while the site had to stay operational.
The approach
- Phased replacement, one line at a time
- Shared new filtration sized for both lines
- Heat recovery feeding the ceremony building
A phased plan kept services running throughout and simplified future permitting.

Technology switch · Western Europe
Evaluating an electric cremator for net-zero targets
The challenge
A city council set a decarbonisation target and asked whether electric cremation suited its volume and grid capacity.
The approach
- Total cost of ownership modelled for gas vs electric
- Grid connection study before tender
- Continuous-operation shift pattern considered
The decision hinged on grid upgrade cost and utilisation — not on equipment price alone.

Start-up · United Kingdom & Ireland
Starting a pet crematorium from scratch
The challenge
Two veterinary partners wanted to offer individual pet cremation with full traceability.
The approach
- Volume forecast from partner vet practices
- Partitioned hearth plus a small individual unit
- Ash traceability and memorial room
Right-sizing the first unit kept capital low while leaving space for a second line.

New service · North America
Adding water cremation alongside flame
The challenge
A funeral group saw family demand for a lower-emission option where alkaline hydrolysis is legally permitted.
The approach
- Legal status checked per state
- Wastewater discharge agreed with the utility
- Family-facing explanation and pricing
Utility approval and family communication proved as important as the equipment itself.
Scenarios are illustrative composites and do not describe a specific client, site or manufacturer. Images are illustrative.